Archer Aviation
Midnight, a piloted all-electric air taxi. FAA certification is in progress.
Active
Public float $6.5BCompanies reporting FAA Phase 3 closed on the path to type certification.
This is a directory label from public materials, not a safety rating. How to read certification stage labels explains what each phrase means here.
The FAA’s original design-approval overview splits a type certificate project into five phases: conceptual design, requirements definition, compliance planning, implementation, and post-certification. In that guide, Phase III is compliance planning, when the company and the FAA agree on a detailed plan for showing the design meets each rule. Sources: FAA, Original Design Approval (opens in new tab), FAA and Industry Guide to Product Certification (opens in new tab).
Companies can number their own steps differently. Archer says it closed Phase 3 of a four-phase FAA process for Midnight in April 2026 and is working on Phase 4, where compliance is shown through formal testing and analysis. Archer calls that the first eVTOL close of Phase 3 in the FAA’s four-phase process. That’s Archer’s own description. How the FAA certifies powered-lift air taxis covers the broader powered-lift path. Source: Archer, May 11, 2026 (opens in new tab).
Closing Phase 3 is not a type certificate. It means the earlier planning steps are done; the aircraft still has to show compliance and get production approval before passenger service under ordinary FAA rules. How to read certification stage labels explains what each phrase on this site does and doesn’t claim.
How to read certification stage labels compares every stage on this site.